ARCHISATE STABIO LINE - BEVERA VIADUCT (RFI)

FES was involved in the construction of this important viaduct (surface area of approximately 30,000 m2 with a total weight of approximately 5,000 tons) performing blasting and anti-corrosion treatment.

1066x410 sabbiatura strutture viadotto della bevera tratta arcisate stabio 10header

Place

Italy-Switzerland border

Client

Salcef Group S.p.a.

Job

The client asked FES Srl to clean the structure by blasting and then apply the special anti-corrosion coating, which will ensure the structure will hold over time.

Treatments carried out

185x80 LOGHI fincantieri
185x80 LOGHI 0010 R Affmetal
185x80 LOGHI 0007 Gruppo Mauro Saviola
185x80 LOGHI 0006 alfaautomation
185x80 LOGHI valsir
185x80 beton
185x80 LOGHI vezzola
185x80 itinera
185x80 salcef
185x80 LOGHI 0003 alfa acciai logo
185x80 LOGHI 0002 manni sipre
185x80 fermont
185x80 LOGHI 0004 ferrero logo colore
185x80 LOGHI 0012 Ori Martin
185x80 ferriera
185x80 LOGHI CMM fratelli rizzi